Feller-Buncher Operator Breaks Power Line
BACKGROUND: On a summer day in the South, a rubber-tired feller-buncher operator was performing a first thinning in a pine plantation. The feller-buncher was working in a new area of the stand, removing the take-down row and thinning the two rows on either side. The trees were approximately 15 years old, and there was a relatively thick layer of underbrush. The stand of timber surrounded the landowner’s home.
PERSONAL CHARACTERISTICS: The operator was in his mid-20s and had run feller-bunchers for about three years.
UNSAFE ACT AND CONDITIONS: The power company’s metered line ran from the pole-mounted transformer through the landowner’s maintained yard to the landowner’s home. A second metered line also ran from the transformer to a pole-mounted night light approximately 100 yards away on the bank of a small farm pond. The right-of-way to this second metered line was not maintained, and the line was completely obscured by the pine plantation and the thick underbrush and regrowth. Additionally, the line was only about 10 feet off the ground at its lowest point.
As the feller buncher was thinning, the operator did not see the power line ahead of the machine and continued cutting.
ACCIDENT: The head of the machine made contact with the line and pushed it forward far enough to cause an electric arc and break the line. After seeing the electrical arc and then the power line, the operator slowly backed the machine a safe distance away from the downed line.
INJURY: The operator was not injured.
RECOMMENDATIONS FOR CORRECTION:
- Harvest preplanning should include locating and marking all utilities.
- Close coordination with the landowner is essential when the harvest area includes dwellings, barns, septic systems, farm ponds, etc.
- Any unusual or dangerous areas or features of the harvest tract should be discussed and field-verified in advance with all machine operators to ensure operational safety.
- Whenever possible, maintain a safe operating distance of at least 50 feet (more for tall trees) from a power line for all harvesting activities.
Courtesy of the Forest Resources Association: forestresources.org
Latest News
Alabama Timber Industry Facing Tough Times
Experts fear a host of factors are coming together to create a storm, possibly even a perfect storm, across Alabama's forest landscape, which is the reason why they are stepping up efforts to warn timberland owners about this potential calamity and to advise them...
Southeast Biomass Study: Is It Too Late?
A new study of southeastern forests in the U.S. finds that in the long run, burning wood instead of fossil fuels to make electricity can reduce heat-trapping carbon dioxide in the atmosphere, but not soon enough to prevent worsening the conditions leading to global...
Have A Question?
Send Us A Message