Georgia-Pacific Completes Warrenton Mill Project
Georgia-Pacific celebrated the official opening of its newest lumber facility with an onsite dedication in Warren County, Georgia. The $135 million, 340,000 sq. ft. plant is located on the same site as an existing lumber mill.
The new facility adds more than 80 workers to the existing workforce. At the rate of current production, the GP Warrenton facility will receive approximately 200 truckloads of pine logs a day and produce as much as 350MMBF per year.

The facility plans to outturn three times the output of the previous facility, shipping 57 trucks of lumber each day to locations and customers across multiple states. The Warrenton facility is the second of three new lumber production sites planned by G-P. The third facility is under construction in Albany, Ga., with plans to open next spring.
Latest News
BRANCH FALLS FROM HAZARD TREE AT LOG LANDING
BACKGROUND: A logging crew was clearcutting a hollow in the Appalachians. The hollow was to be used as a hollowfill for an impending surface mine. The crew was in somewhat of a rush to get the timber removed before mining operations began. PERSONAL CHARACTERISTICS:...
Have A Question?
Send Us A Message