New OSB Project In Alabama Gains Permitting
Peak Renewables U.S. Inc. has received required permitting for the construction and operation of a greenfield 650MMSF oriented strandboard plant in Enterprise (Coffee County), Ala.
Last February, the Enterprise City Council approved ordinances to convert a 300 acre property into an industrial property. Shortly thereafter, ACES Consulting Group, on behalf of Peak, submitted the permitting application to Alabama Dept. of Environmental Management (ADEM). ADEM subsequently granted permits for the various development and production processes during the latter quarter of 2024.
The operation calls for SYP logs to be delivered to the site by truck, followed by three rotary drum debarkers and three stranders, two parallel single-pass rotary drum dryers (along with a Biomass Energy System using two biomass-fired combustion furnaces), two blenders for mixing liquid phenol formaldehyde resin and wax emulsion, four-layer mat forming station, multi-opening press, and finishing line.
Exhaust from both dryers would be routed to a wet ESP and to an RTO. Emissions from the press would be directed through an RCO.
Some early work is being done at the site.
Peak Renewables operates an industrial wood pellet facility and cross-laminated timber and glulam facility in Dothan, Ala.
Latest News
Georgia Scientist Developing Pine Trees Without Pine Cones
A Turfgrass scientist from Tifton is working to breed a tree without pine cones or pollen. For the past nine years, Wayne Hanna has been working to produce a coneless pine tree. Hanna says it would prevent spending time picking up pine cones. "I walked in the house...
Tennessee Logging Family Faces A Crossroads: Who Will Carry On The Trade?
Timber is a big business in Tennessee. Around $1 billon of the state’s tree products are shipped abroad every year, and state economists estimate that it’s a $20 billion industry. But logging experts are worried about the future of the labor force. With massive trees...
Have A Question?
Send Us A Message